- Deakin University vacated a tenancy at 550 Bourke St – Make good required
- Project to demolish existing interconnecting stairs between two levels and make good back to pre lease condition
- The challenge was to keep Deakin Prime’s conference facility operational whilst the works were undertaken after hours. The tenancy and base building had to be thoroughly cleaned after each shift
Symmetry Commercial engaged to manage the entire project, demolition, make good and commissioning of services. Scope included;
- Pre commencement and preliminaries
- Building Permits
- Demolition & Protection Works
- Structural & Fire Engineers
- Scaffolding
- Structural Steel & fabricators
- Electrical Services
- Fire Services
- Mechanical Services
- Plasterers
- Concrete Rectification
- Flooring
- Carpet
Concrete make good of slab was challenging. The void was filled wheel barrow by wheel barrow and brought up through the goods lift.