Symmetry Commercial were engaged on behalf of Programmed Maintenance, after winning a competitive tender, to carry out these relocatable classroom upgrade maintenance works.

At the request of the client we agreed to deliver two relocatable classroom upgrades in 3 weeks which was an ambitious deadline. Our flexibility combined with our experience proved very precise with the project being delivered on time and on budget… with 30 minutes to spare!

Symmetry Commercial worked with the client’s scope with aspects further enhanced at our recommendation – developing the quote from a bare minimum to a standard which the VSBA would be proud of (some Symmetry Commercial extras shown below in the italicised text).

Scope of works included

  1. Replace all dilapidated cladding affected areas and prep/paint entire area. Remove and replace all cladding with custom-orb and weathertex. Fill screw holes and paint new weathertex
  1. Assess and unblock external guttering
  2. Re-connect down pipes to storm-water
  3. Sand down, fill, putty and provide surface protection for windows
  4. Cover DB & re-fix conduit
  5. Standard prep works & painting

Paint internal wall lining inclusive of minor prep work.

Paint ceiling inclusive of minor prep work

  1. Remove & replace floor coverings
  2. Sand down, fill, putty and provide surface protection to external baseboards

Supply and install new baseboards

Paint new baseboards

  1. Remove & replace with BCA compliant stairway & landing at entry point, install non-slip tread nosing’s to all steps            

Pour new concrete pad at base of landing

  1. Install fire extinguisher on bracket adjacent to entrance

Supply and install 1 x 3.5l CO2 fire extinguisher with compliant signage

    11. Supply and install new 7.1kw Mitsubishi split system AC

    12. Replace glass where old AC is removed

    13. Supply power to new AC 

With Project Management and inspections of all works including the Plumbing and Electrical carried out by Symmetry Commercial the pictures show another building refurbishment job well done.

All works complied with the Building Standards Handbook and further specifications as per the Victorian School Building Authority (VSBA).

Symmetry Commercial managed & provided the complete building trades composing of plumber’s, carpenter’s, joiner’s, electrician’s, painter’s, plasterer’s, carpet layer’s, concreter’s & fire services technician’s.

Another project delivered on time and on budget, including managing unplanned lead removal, with HAZMAT suits, protective plastic, separate bins etc.  The project was delivered during school term with the full team all carrying current working with children checks.